The El Centro Sector wall replacement is one of Border Patrol’s highest priority projects. Wall in this area was built in the 1990s out of recycled scraps of metal and old Vietnam War era landing mat. Although the existing wall has proven effective at deterring unlawful cross border activity, smuggling organizations damaged and breached this outdated version of a border wall several hundred times during the last two years, resulting in costly repairs.

El Centro Sector continues to experience a high number of apprehensions of illegal immigrants and drug smuggling. In fiscal year 2017, the El Centro Sector apprehended 18,633 illegal aliens, seized 5,554 pounds of marijuana, 483 pounds of cocaine, and 1,526 pounds of methamphetamine and 2,521 ounces of heroin. During that fiscal year, there were 21 assaults against El Centro Sector agents.

Leadership within the El Centro Sector has made great efforts to collaborate with local and state authorities to address any issues that may occur during the construction period. The Border Patrol works diligently with supporting agencies to ensure its presence minimally disturbs the surrounding environment and habitat.

The construction of a more substantial replacement wall will better ensure the safety of agents and the public and create a better atmosphere for business and commerce, all while enhancing overall border security.

 
Border Patrol agent James Nielsen stands near the original Vietnam-era landing-mat border fence near Chula Vista, Calif. Credit:  NPR

Border Patrol agent James Nielsen stands near the original Vietnam-era landing-mat border fence near Chula Vista, Calif. Credit: NPR


 
 

El Centro Wall #1

Overview:

The area of the border wall replacement will be an approximately 2.25-mile section replaced with 30-foot high bollard style wall. The project covers an area from approximately the Calexico West Port of Entry extending westward beyond the Gran Plaza Outlets. The project also includes around 2.25 miles of all-weather roads.

Fun Fact: This is considered Trump’s first Border Wall project which he commemorated with a plaque (see pictures below)

Pictures:

Videos:

 
 

 El Centro Wall #2

Overview:

On June 27, 2019, U.S. Customs and Border Protection (CBP), in partnership with the U.S. Army Corps of Engineers (USACE), began panel installation for approximately 11 miles of new border wall system in place of dilapidated and outdated designs in Calexico, California within U.S. Border Patrol’s (USBP) El Centro Sector. This project will include the construction of 30 foot tall steel bollards and technology improvements.

Pictures:

Videos:

 
 

 El Centro Wall #3

Overview:

CBP proposes to replace approximately 15 miles of existing vehicle barrier with new bollard wall in Imperial County, California. The project also includes the improvement or construction of roads, the installation of lighting, and installation of other detection technology.